PROJECT TERMS AND CONDITIONS
QUOTES & PAYMENTS
Greenlink requires an 90% deposit on any accepted quotes, before any work for the client may begin. The remaining 10% has to be paid once the work has been completed, unless agreed upon beforehand.
- Please Note:
- Standard call-out fee: R550.00 (George area)
- General maintenance hourly rate: R850.00
- Projects are quoted with total project cost
Quoted time ranges are estimates. Final charges will reflect actual time spent on the project.
Payment of the deposit serves as full acceptance of these terms and conditions.
Quotations reflect a total project cost. If the client requires a line-item breakdown before work begins, an admin fee will apply. A full itemized invoice will be provided upon completion.
Greenlink’s quotes has a fee, as it requires technicians to first complete a time consuming inspection of what the client needs or provide consultation assistance. Should the quote not be accepted, clients will be liable for this amount, as a consultation and/or inspection fee.
COC - CERTIFICATE OF COMPLIANCE
COC inspections are required to ensure compliance and safety.
According to law each property must be in possession of a valid COC.
A supplementary COC for work done can only be issued if a valid existing COC is provided by the client, otherwise a full COC needs to be issued.
Standard COC certificate cost: R2 500.00 (excl. VAT)
Required repairs will be quoted separately and must be completed before a COC can be issued.
Repair work requires a 90% deposit before scheduling.
- If repair quotes are declined, inspection fees apply as follows:
- Residential: R850.00 (excl. VAT) per DB board
- Commercial/Industrial: R1 500.00 (excl. VAT) for main DB, R850.00 (excl. VAT) for each additional DB
Greenlink acts as a third-party and is not party to any sale or transaction of the property requiring the COC.
All certificates will only be issued once full payment is received.
GENERAL TERMS
Greenlink is not responsible for any materials after it has been installed, but will adhere to faulty material warranty. Greenlink cannot be held liable for theft and/ or damage caused to the installed, repaired or replaced items.
Any additional or extra work that does not form part of the original quote, will be quoted on separately and will require an amended 80% deposit to be settled on before any additional or extra work is scheduled.
Greenlink is not responsible for the damage, repair or loss for any tools on project sites, nor is Greenlink responsible to pay any additional fees related to any plumbing or electrical connections.